
The rest of the dirt in the basement area has been excavated out. The small track hoe is digging a key way that will be under the footing on the length of concrete wall that will be 10 feet high. I would never have known what a key way is were it not for this project. The only dirt left to be excavated is the garage area which in this picture is above the track hoe. We're getting closer to the start of a foundation.
No comments:
Post a Comment