More detail work is getting completed. Trim boards are all up around the screened porch and this particular block is for the intercom at the front door. Porch ceilings look to be going up tomorrow and they should be close to completion on the outside of the house. Low voltage continues to be wired and if not complete, it's very close. Mark is running wire through the conduit to the pole building so the pumps will be on the backup system. A lot of people doing a lot of things. Days will now start to get longer, a red letter day on my calendar.