Insulation crew worked through the weekend to finish up their work. Any areas that can't be blown into the ceiling had bats put in place. Wall system is a little different in that it is also a blow in system. A mesh is put up on the studs first then insulation is blown in place. It has a higher R value than what you'd normally get. We gave it a try on Josh's recommendation. He also used it in his own house. Sound insulation was put in most interior walls and between floors. In addition, the man cave had rock wool plus the sound insulation put into the ceiling similar to what would be done in a theater room. Heating system is warming the house up now. I'm having fun checking the temperature difference in the concrete between heated areas in the basement and the storage areas. It's
Ok to laugh at me, I laugh at me. Sheetrock is going up this week so we are staying on schedule.