The concrete in the loggia was cut or grooved to accommodate a conduit for possible later use. If we put a hot tub in that location they will be able to wire it in after the flagstone is in place.
JW was here and installed (mostly) the air
recirculating system. They need power which Mark will take care of. We are getting closer on this system.

Finish carpenters put up more molding on the windows. They also are getting more cedar on the great room ceiling. Sue was here yesterday to look at all our selections (granite, tile, flooring, etc). She is also helping with exterior colors.