Flooring guys started covering the stairs down into the man cave. It takes a lot of time.

Viktor has moved up into the master bath. Tile is on the tub deck.

He also is getting the shower prepped for tile. Please note: The red tubes will be connected to the in floor heating and heat the shower seat which will be put in place. There are also additional tubes under the shower pan he poured. No finish carpenters today.