The trenching has started. This one will hold the two 2" water lines, one for house and irrigation and one for fire sprinklers. Tomorrow the concrete slab will be poured for the basement. We also have a meeting with the pump guy so we can figure out how to push water through those two 2" lines.Thursday, July 23, 2009
Trenching Starts
The trenching has started. This one will hold the two 2" water lines, one for house and irrigation and one for fire sprinklers. Tomorrow the concrete slab will be poured for the basement. We also have a meeting with the pump guy so we can figure out how to push water through those two 2" lines.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment