Friday, January 8, 2010

Best To Stay Out Of The Way

Sheetrock was delivered today amidst the insulation install. They seem to be getting through the rain in a minimal amount of time although a couple of sheets we saw got wet. I think things will be Ok though.

Two truck loads in the driveway with this handy device to get it to the house. However, sheetrock is still sheetrock and handling it is still by hand once it's inside. The person carrying it up into the woman cave says he doesn't need a gym membership.

From inside the loggia the stone is up to the top, at least on this side. Keith (and the guys working with him) got the ceiling covered and trimmed out. The juniper fire place shelf was also put up today. It's well protected so it doesn't get banged up. A lot of activity once again which I like.

No comments: