A lot of people here today. Plumbers installed the water filter and tied in the old water line to the new system. Tie in is so that if the main pump fails we just turn one valve off and the other valve on and we still have water inside the house from the original pump. It's redundant as they also set up a by-pass in the pole building but this way we only need to go into the basement to make the switch. Keith got the screened porch trimmed out and posts on the upper back porch mostly trimmed. Masons have worked their way up to the arches in the loggia on one side. It will make a better picture when the tarps come down. Heating guys are getting the rest of the heating system put together. I think when they are finished we will have real heat in the house. Insulation is supposed to be started this week or at least that's the rumor.